You may send us the design files when you decide to place the order.
In the producing phase:
* Files required for bare-board fabrication: Gerber files, Drill files, IPC-356A (Optional)
* Files required for SMT assembly: Gerber files, Drill files, X-Y data, Bill of Materials (BOM) in Excel format (for both consigned and turnkey orders).